Measurement of the suitable work area for the creation of formwork for concrete pours.
Liaising with relevant site operatives to have areas ready for installation of formwork, ensuring that surface area is functional and free from excess debris.
Creating of formwork for concrete by use of specified material and quality of finish needed for concrete, e.g. finishing timber, oiled timbers, etc. Once formwork is complete, liaise with re-enforcement workers to place steel reinforcement in line with technical drawings.
Checking and ensuring that all formwork and reinforcement are correct and fully measured before concrete is poured.
Pouring of concrete to formwork in line with technical specifications on concrete volume, density and required strength levels
Once the concrete is poured and has been given time to set and is deemed to be ready for removal by the site supervisor perform a careful and precise removal of formwork, ensuring that no damage is done to fresh concrete.
Fluency in Russian and Polish desired.
Minimum gross annual remuneration: €30,000
Hours per week 39 hours
Call on 0838458696 or email teddy@tellconstruction.ie
Employer Ted & Lloyd Ltd t/a Tell Construction, Dun Laoghaire, County Dublin.
Construction Trades Civils
Dublin